Tile Shower
Replaces
your old tub. As seen at the IOWA STATE FAIR.
|
|
|
$3500 TILE SHOWER or TUB, including: |
|
|
Remove Old Tub |
|
|
Remove walls over tub down to the framing |
|
|
New shower faucet Delta T13220 Chrome finish |
|
|
New Fiberglass shower pan 30 x 60 or Fiberglass tub 30 x 60 |
|
|
Brass shower drain connected to existing drain |
|
|
Cement board glued and nailed on walls 6' high |
|
|
Ceramic tile & grout 6' high - you choose the tile |
|
|
Color fast Permagrout - won't stain, sealing not necessary |
|
|
Ceramic bullnose tile at front & top of shower |
|
|
Curved chrome shower rod Moen CSR2165CH |
|
|
Cleanup daily and haul garbage to dump |
|
|
|
|
|
OPTIONS - Add to above $3500 price |
|
|
Add a line of Decorative tile at center of shower |
$150 |
|
Corner seat - Tiled like walls |
$225 |
|
Each hand safety bar - Moen 16" or 24" - chrome |
$100 |
|
Chrome hand shower on adjustable rod & wall elbow Delta 50560 |
$250 |
|
Shower Door Basco 7150-60 SV/OBS - Silver & obscure glass |
$550 |
|
Delta T11651 diverter valve - |
$375 |
|
(Valve switches water between shower head and hand shower) |
|
|
Tile over tub or shower to 8' ceiling height |
$350 |
TILE
SHOWER
1.
Your old tub and the walls around your old tub are COMPLETELY REMOVED
down to the studs. We add
additional insulation in the walls around the shower if needed to keep the
shower area warm. If there is old
water damage to the floor, we repair
it.
2.
The new shower faucet of your choice is installed, with a new fiberglass
shower floor pan and drain. The
water tight fiberglass pan is installed in a bed of concrete to make the floor
extremely strong and level. (A new tub can be installed instead of a shower pan
if you prefer a tub.)
3.
Sheets of “Cement Board” are screwed to the stud walls above the
floor pan. The corners and joints
of the cement board are sealed water tight, so the shower is actually water
proof at this time, even before the tile is installed.
4.
Your choice of ceramic tile, granite, or Fiberglass is installed on the
walls over the cement board using mortar cement adhesive, creating a second
waterproof layer.
5.
Colored Permagrout is used between the tiles for beauty and waterproofing
HOW LONG
DOES IT TAKE?
It
takes about 3 days from start to completion.
It
costs about $3500 TO $5000 depending on the tile and plumbing fixtures you choose.
We
think it is better to remove the old tub and replace it with all new.
Why? Because we can add wall
insulation if needed. Who wants a cold shower?
Often the old wall or floor is water damaged. We can repair any old water damage that may lead to dry rot.
There
is no way mold can grow between the old tub and the new shower because the old
tub is completely removed and hauled to the landfill. Black Mold has been proved
to be a Major Health Hazard.
Yes, ordinary bathroom cleaning products are used, like Soft Scrub or Scrubbing Bubbles..
To help our customers find quality tile and plumbing fixtures we have establish our SHOWROOM PARTNERS program. "Showroom Partners" is a group of wholesale specialty suppliers with showrooms in the Des Moines area were you can go see and choose the products you want to use in your remodel. These Showroom Partners are time tested companies where you will receive high quality products with expert advice in their field. You'll receive SERVICE, EXPERT ADVICE, and QUALITY PRODUCTS.
When you choose the products you want, our Showroom Partners fax us your choices. Because these are WHOLESALE suppliers in their field, we can buy from them at wholesale prices, and we pass the savings on to you at discounted prices.
After we receive your choices by fax, we can update your final estimate.
1. All work comes with a
guarantee.
2. Low competitive prices.
3. 38
years experience.
4. References are given.
5.
Free
estimates.
WE
INSTALL FIBERGLASS SHOWERS TOO. MANY STYLES TO CHOOSE FROM.
|
|
|
|
|
|
WHAT’S THE PROCEDURE?
1. First phone us to let us know you would like an estimate.
Our estimators work evenings and weekends so they can come to your home
after work.
2. Our estimator will come to your home and discuss your project
and how you would like it done. The
estimator will take this information back and do a “Preliminary Estimate”
that will be mailed back to you.
3. After you receive your Preliminary Estimate and have a general idea of the price, if you would like to go ahead with the remodel, call us again and we’ll come back out to discuss the details and help you decide on specific products. This is where our Interior Designer can help you. If you would like to see the products you want to use, we give you a list of approved SHOWROOM PARTNERS, where you can go see their showroom and choose the specific products you want..
We take this information
and update your estimate. Then we
mail you a remodeling contract showing the exact price.
HARTMAN
CONSTRUCTION
And
Remodeling Co.
38 Yrs. Experience
Free
Estimates
Licensed
& Fully Insured
Des
Moines (515) 278-1866
Fax (515) 833-9984